“Quality Assurance” and “Quality Control” are not the same. Quality assurance type of work assures that a final product meets specifications and expectations, whereas quality control is the process by which the final product is monitored to ensure its safety and integrity.
Quality Assurance (QA), refers to the implementation of proactive processes that aim to prevent defects. Quality Control (QC) simply refers to the process of inspecting the product to identify and correct defects. As a tool, QC can be thought of as a corrective tool, typically carried out by a specific group of individuals on a job site; the inspectors and project engineers who walk and document items that need corrective action. QA is a management tool that can incorporate everyone on the team through planned and systematic activities that aim to prevent defects before they occur.
The Function of a QA/QC Civil Engineer

- Monitoring and planning
Quality assurance procedures are planned and monitored, and quality plans are developed for the company’s projects. Maintain and update records for all quality sheets and documentation; plan to record and register all construction quality elements.
- Contracting and Tenders
Costs for tenders and contractors are prepared, negotiated, and analyzed. Work effort coordination Permission ensures that all materials to be used and installed are relevant and approved by the client for the project.
![]()
- Checks the quality and storage of the material.
Check the quality of materials like cement, sand, aggregate, and steel. Concrete quality tests include cube testing, concrete temperature, slum testing, and concrete vibration. Other checking details are that the material should be stored in a dry place (not more than three months), its condition should be checked and its connectivity should be close to the construction site.
- Checking site activity and creating a report
On the excel sheet, create a daily progress report and a monthly progress report. Mention all the RCC work and the remaining days (14 days), as well as plaster, and masonry (10 days for water curing), and shuttering time. Internal quality audits of the company’s quality systems, methods, and processes are reported regularly. Work Schedule: Time, Gradual Work Speed, Manpower Daily site inspections should be followed upon.
- Maintains Daily Records
Daily, they interact with and oversee all QA/QC on-site workers as well as operational difficulties. The quality assurance policy established by the project manager must be followed. Ascertain that the project quality plan is followed at all stages of construction, including handover and commissioning. inspections of materials obtained from suppliers, as well as the effective implementation and compliance of the quality control system at project sites.
![]()
- Working Coordination
Coordinate with client-appointed quality inspection teams to handle complicated QA/QC concerns by communicating with project managers to ensure that a quality plan and construction plan are deployed. Train workers and engineers to guarantee that regular project visits are made to enhance and train quality control personnel.
Looking for the best training in civil QA QC courses? Look no further than Capital Institute of Technical Studies! Our experts have years of experience in the field, and we are passionate about helping our students achieve their goals. We offer a variety of courses that cover a wide range of topics, making it easy for you to find the right course for your needs. Sign up today and start learning how to improve your skills as a quality assurance professional!